Saturday, 7 June 2014

 10:47      No comments


Petroleum Engineering Practices




This course is far more than an introduction to petroleum 
engineering and certainly is not a superficial presentation of 
the technology of the industry.  Its purpose will be to develop 
in participants an understanding of the technology and its 
applications at an engineer’s level.  Thus, this course will 
give participants the confidence, professional enthusiasm, 
and productivity which comes from having that 
understanding.

Participants will be placed in the position of Reservoir 
Engineer and “Our Reservoir” will be defined, analyzed, and 
put in production.   Next drill sites will be chosen.  Then, 
participants will be placed in the position of Drilling and 
Completion Engineer and the drilling and completion 
program 
for “Our Well” will be analyzed.  The course will continue and 
focus on the field and application approach, which will 
include 
classroom and outside exercises, fundamental engineering 
problems, and basic field exercises.



Day 1
Reservoir Fluid Properties and Petroleum Geology

  • Reservoir fluid properties
  • “Our Reservoir”
  • Petroleum geology


The day will begin with a presentation on the brief early 
history of the oil and gas industry, set up to show how the 
day’s activities are affected by tradition.  After this, the class 
will form “Our Company” and, based on seismic data, seek a 
concession, obtain the concession, and choose a drill site for 
the first well (wildcat well) to be drilled.  The well will drill 
through an oil zone.  Since the company will be considered 
“Our Company”, then the reservoir will be considered “Our 
Reservoir”.  There will be no indication of the economic 
viability, therefore down hole data will be collected as the 
well 
is drilled.  A reservoir fluid example will be taken and 
analyzed to determine the fluid properties.  Basic geology 
will 
be used to put all decisions in the proper geological 
perspective.


Day 2
Petroleum Reservoirs

  • Petroleum reservoirs
  • Hydrocarbon generation and occurrence
  • Reservoir fluid distribution and flow characteristics
  • Tight oil and gas reservoirs


A core will be taken as the well is drilled through the oil 
zone.  Reservoir rock properties and fluid properties of the 
reservoir will be obtained from the fluid samples, core 
analysis, and well logs.  A drillstem test will be run and a 
decision will be made to complete the well as a cased hole 
completion.  A “pressure build-up test” will be run to assist in 
further defining the reservoir and to determine if an appraisal 
well should be drilled.


Day 3
Hydrocarbon Reservoirs

  • Hydrocarbon reservoir classification and definition
  • Exploration technology
  • Defining the hydrocarbon reservoir   


The reservoir will be further defined by the seismic data and 
reservoir fluid analysis from which the reservoir phase 
envelope is obtained and the appraisal well is drilled.  From 
this information, it will be determined if the reservoir justifies 
development.       


Day 4
Reservoir Development Plan

  • Reservoir development plan
  • Drilling technology and operations
  • Well Completion technology


A reservoir development plan will be prepared, including the 
drilling of the development well.  Drilling engineering and 
operations will be presented in detail, followed by well 
completion technology.  The drilling and completion program 
for development wells in “Our Reservoir” will be prepared.  



Day 5
Production Technology, Recovery Mechanisms, and 
Surface Processing

  • Production technology
  • Reservoir development practices
  • Hydrocarbon recovery mechanisms
  • Surface processing of produced fluids


Production technology options will be considered, including 
primary recovery mechanisms and enhanced recovery 
options, as well as surface processing systems for the 
processing of produced fluids.  All of these will be covered in 
order to show how they can maximize recovery over the 
productive life of the reservoir.  Initial hydrocarbon reserves 
will be estimated.             

0 comments:

Post a Comment

Popular Posts

Recent Posts

Unordered List

Text Widget

Powered by Blogger.